Free Huawei H12-425_V2.0 Exam Actual Questions

The questions for H12-425_V2.0 were last updated On May 2, 2024

Question No. 1

The UPS can generate large leakage currents. A circuit breaker equipped with a residual current device (RCD) is not recommended. If leakage protection is required, consider the leakage current of the UPS and downstream devices.

Show Answer Hide Answer
Correct Answer: A

Question No. 2

As the altitude increases, the air density decreases, and the heat exchange capability of the air in a unit volume decreases. In this case, NetCol8000-E220 works with derating.

Show Answer Hide Answer
Correct Answer: A

Question No. 3

When connecting chilled water pipes for the NetCol8000-C, fill water and preserve pressure 8 hours after the conversion adapter is connected.

Show Answer Hide Answer
Correct Answer: B

Question No. 4

Commissioning NetCol5000-C drainage devices, after lifting the high float for 5 seconds, two water pumps start working, and the drain abnormal alarm is generated.

Show Answer Hide Answer
Correct Answer: A

Question No. 5

Refer to the exhibit.

Show Answer Hide Answer
Correct Answer: A