In a Behind the Switch configuration, the VCS carries out instructions from __________.
With an In-Front of the Switch implementation using Genesys Framework, what type of configuration with T-Server is required in Configuration Manager?
When planning the sizing and capacity for a GVP deployment, which of the following should be considered?